Accelerate your turbine outage with the Hydraulic Casing Closure System using Hydraulic Nut Technology. Quickly close and open inner and outer shells in about 2 to 4 hours.
Bolttech Mannings’ system eliminates the need for bolt heating and torque between initial breakout and final closure by pressurizing select studs simultaneously, which quickly generates loads sufficient to simulate operating conditions. Initial installation and final removal of the system can be completed in 2 to 4 hours.